List of reference

Problem solving in pressurised systems:

 

May 2014 – Sealed exsternal leakage on a 36″ inlet valve on Heimdal (trunnion ball valve).

 

June 2015 – Cleaned and sealed ESD valve on Kvitebjørn (trunnion ball valve).

 

September 2014 – Cleaned the 42″ Langeled  inlet valve to Easington England. Got the valve within the acceptable leak rate (solid slab).

 

October 2014 – Cleaned and sealed a 36″ pig inlet valve on Draupner (trunnion ball valve).

 

November 2014 – Sealed external leakage on a 10″ ESD valve at Lyse Neo in Stavanger (solid slab).

 

November 2014 – Cleaned and sealed 12 of 24″ metering valves in St.Fergus Scotland (trunnion ball valves). Gassco metering station.

 

February 2015 – Problem solving on a 36″ class 600 ball valve (trunnion ball valves) at St.Fergus Scotland. To slow operation  .

 

February 2015 – Replaced spindle packings in pressurised system and reduced operational friction on ESD by-pass valves Lyse Neo Stavanger (2″ gate and globe valves).

 

March 2015 – Sealed exsternal leakage on a 12″ valve on Oseberg sør (trunnion ball valve).

 

April 2015 – 10 days with valve maintenance and trouble shooting on the Troll A installation

 

May 2015 – Sealed external leakage in the spindle seal on a 42″ gate valve and sealed an external leak from the bonnet on a 36″ gate valve on Kårstø (Solid slab and dbl expanding gate valve).

 

May 2015 – Cleaned and sealed 12 of 24″ metering valves in St.Fergus Scotland (trunnion ball valves).Totals metering station.

 

May 2015 – 14 days with valve maintenance and trouble shooting on the Sleipner R installation

 

June 2015 – 3 days with valve testing at the Gassco plant in Dunkerque.

 

August 2015 – 3 days with valve maintenance and problem solving at the Troll C installation

 

September 2015 – Maintenance and problem solving on one 42″ parallel gate valve and four 42″ trunnion ball valves at the Gassco Emden plant

 

November 2015 – Problem solving and and maintenance program at the  Gassco Easington plant

 

January 2016 – Cleaning and sealing of 24″ ball valve at the Kårstø plant

 

January 2016 – Cleaning and sealing of two  36″  trunnion ball valves at the Gassco Emden plant

 

February 2016 – Three days of maintaining trunnion ball valves on the Troll A installation

 

March 2016 – Seven days of maintaining trunnion ball valves on the Troll C installation

 

April 2016 – Problem solving and maintenance on leaky valves on the Sleipner R installation during the stop

 

May – June 2016 – Two weeks of problem solving and maintenance on leaky valves on the Troll A installation during the stop

 

June 2016 – Maintenance and sealing of 36″ and 40″ trunnion ball valves on the Draupner installation

 

June 2016 – Four days of maintenance and sealing of valves  on the Sleipner A installation.

 

June 2016 – Maintenance and sealing of 6 trunnion ball valves 30″ and 36″  on the Draupner installation

 

August – Septeber 2016 – Two weeks of problem solving and maintenance on leaky valves on the Sleipner A and R installation during the stop

 

November 2016 – Four days of maintenance and sealing of valves  on the Draupner installation.

 

November 2016 –Three days valve training course for Gassco in Easington

 

January 2017 – Two three days valve training course for Gassco in Easington. 17 – 19th and 21 – 23rd of January

 

March 2017 – Five days  valve consultancy  on Sleipner A installation 06 – 10.03. Stop job.

 

April 2017 – Four days of valve maintenance at LRF Gassco plant 01.04 – 04.05.

 

May 2017 – Three days valve training course for TDW offshore service in Stavanger Norway. 29 – 31rd of January.

 

June 2017 – 13 days  valve consultancy  on Draupner installation 13 – 26.06. Stop job.

 

September 2017 –Three days valve training course for Gassco in Easington 12 – 14.09

 

October 2017 –Three days valve training course for National Grid UK  24 – 26.10

 

March 2018 – Three days valve training course for TDW offshore service in Stavanger Norway. 19 – 21.03.

 

April 2018 – Four days  valve consultancy  on Draupner installation 09 – 12.04. Stop job.

 

April 2018 – Two days  valve valve training: For valves with rising spindle.  16 – 17.04. For Statoil in Bergen

 

April 2018 – Two days  valve maintenance in Haugesund. Lubricating valves for projects 18 – 19.04

 

May 2018 – Three days  valve testing for Equinor FAT in Italy. 14 – 16.05

 

May 2018 – Five days of valve maintenance at LRF Gassco plant in Easington 21 – 25.05.

 

June 2018 – Two days of valve survey at Gassco Easington and Dornum plant 29 – 31.06.

 

June 2018 – Valve repair on 10″ class 1500 solid slab valve at Lyse Neo plant in Stavanger 12.06.

 

August 2018 – Valve maintenance and  valve repair at  Gjøa. Cleaning of  9 valves, trunnion ball valves and parallel gate valves 30.08 to 05.09.

 

September 2018 – Four days Valve training course  for  TS Group in Porsgrunn.

 

 

Reference Gassco

.